MIL-H-43540C
*
4.1.1 Responsibility for compliance. All items must meet all requirements
of sections 3 and 5. The inspection set forth in this document shall become a
part of the contractor's overall inspection system or quality program. The
absence of any inspection requirement in the document shall not relieve the
contractor of the responsibility of assuring that all products or supplies
submitted to the Government for acceptance comply with all requirements of the
contract. Sampling in quality conformance does not authorize submission of
known defective material, either indicated or actual, nor does it commit the
Government to acceptance of defective material.
*
4.1.2 Responsibility for dimensional requirements. Unless otherwise
specified in the contract or purchase order, the contractor is responsible for
assuring that all specified dimensions have been met. When dimensions cannot
be examined on the end item, inspection shall be made at any point or at all
points in the manufacturing process necessary to assure compliance with all
dimensional requirements.
4,1.3 Certificates of compliance. When certificates of compliance are
*
submitted , the Government reserves the right to inspect such items to
determine the validity of the certification.
The inspection requirements specified
4.2 Classification of inspections.
herein are classified as follows:
First article inspection (see 4.3).
a.
b.
Quality conformance inspection (see 4.4).
4,3 First article inspection. When a first article is required (see 6.2),
it shall be examined for the defects specified in 4.4.3 and 4.4.4 and tested
as specified in 4.5.5. The presence of any defect or failure of any test
shall be cause for rejection of the first article.
4.4 Quality conformance inspection. Unless otherwise specified, sampling
for inspection shall be performed in accordance with MIL-STD-105.
4.4.1 Component and material inspection. In accordance with 4.1,
components and materials shall be inspected in accordance with all the
requirements of referenced documents unless otherwise excluded, amended,
modified, or qualified in this document or applicable purchase document.
*
4.4.1.1 Certification. Certificate of compliance, certified test reports,
approval labels or listing marks for codes and standards, as applicable, that
are submitted as proof of compliance with specification requirements shall be
examined and validated.
*
4.4.2 In-process inspection. Inspection shall be made of the following
operations and requirements to establish conformance to specified
requirements. Whenever nonconformance is noted, correction shall be made to
the items affected and to the operation. Items which cannot be corrected
shall be removed from production.
9